SPIC PANZHIHUA ENERGY STORAGE STATION
The SPIC Panzhihua Energy Storage Station is a 100 MW / 500 MWh vanadium flow battery project being developed in phases in
Panzhihua, Sichuan Province, China. Phase I (12 MW / 60 MWh, 5-hour duration) was delivered by RKP and commissioned in
June 2025, achieving commercial operation status in January 2026.
This project is recognized as the world’s first front-of-the-meter (FTM) VFB energy storage system to adopt a vanadium electrolyte
leasing model. By separating electrolyte ownership from the battery system ownership, this innovative commercial structure
reduces upfront capital costs and creates a new pathway for financing VFB projects.
The project is located in the TuanShan area of the National Vanadium-Titanium High-Tech Zone in Panzhihua, leveraging locally
produced vanadium electrolyte. It is one of Sichuan Province’s first batch of emerging energy storage demonstration projects
and the largest VFB project in Southwest China.
In Panzhihua, RKP went beyond supplying equipment — the company built a local electrolyte manufacturing facility that
produces electrolyte on-site using vanadium recovered from locally generated steel slag. The Panzhihua project demonstrates
how a VFB project can anchor local vanadium processing, electrolyte production, and system integration capabilities.
